Search Results for:

Recap: Tritech’s Social Event at the Abbotsford Canucks Hockey Game!

We’re thrilled to share the fantastic turnout and memorable moments from our recent social event held at the Abbotsford Canucks Hockey Game on Saturday, March 16th, 2024, at 7 PM. It was an incredible evening filled with excitement, camaraderie, and plenty of cheering for our team! We extend our heartfelt gratitude to everyone who attended …

Recap: Tritech’s Social Event at the Abbotsford Canucks Hockey Game! Read More »

Services

OUR SERVICES Water Infrastructure Construction & Design Tritech provides integrated design, project management, and construction services for water infrastructure projects.We deliver quality, cost effective, environmentally friendly treatment plants and pump stations that are easy to operate and maintain. DESIGN BUILD Our design-build team saves clients time and money, allowing for a more creative, efficient, and …

Services Read More »

Happy Lunar New Year

In honor of the upcoming Lunar New Year, we are excited to invite all our staff to a special lunch event at the head office on Feb 9, 2024! This festive occasion promises to be a delightful experience filled with good food and great company. To mark this auspicious occasion, we have curated a mouthwatering …

Happy Lunar New Year Read More »

Whiskey Creek Transmission Main and PS

As Prime Contractor for the project, Tritech was responsible for the supply and installation of the Service Area Transmission Main and Pump Station for the District of Nanaimo. Overcoming Challenges/ Value Added Long lead time on specified pumps, provided alternate pumps with a shorter lead time which met project requirements and provided additional space inside …

Whiskey Creek Transmission Main and PS Read More »

Oxford Reservoir and Pumphouse

Tritech completed the construction of a 2 MLD (1730 cubic meter) reservoir and associated pump house and chlorination system as part of a water system upgrade for the City of White Rock. Project valued at $3.6 Million. Challenges / Value Added The City of White Rock placed great importance on preserving large fir trees at …

Oxford Reservoir and Pumphouse Read More »

Burrard Pump Station Refurbishment

Tritech is the prime contractor for the refurbishment of the Burrard Pump Station, including the Kent & Kinross Pump Station. The work site is located under the West Cordova Street Viaduct in Vancouver, BC. The existing BPS was constructed in 1984, and requires significant upgrading, including structural, mechanical, piping, ventilation, and electrical work. The station …

Burrard Pump Station Refurbishment Read More »

Lulu Island Wastewater Treatment Plant Pilot Digestion Optimization Facility

As Prime Contractor for this project, Tritech is responsible for the supply, fabrication, installation, testing and commissioning of an anaerobic digester pilot facility consisting of four skids containing tanks, pumps, heating equipment, piping, instrumentations, controls, panels, and all ancillaries at the Lulu Island Wastewater Treatment Plant in Richmond, British Columbia. Project valued at $5 million.

Installation of Two South Surrey Odour Control Facilities

The South Surrey Interceptor is a series of interconnected sanitary sewers owned and operated by Metro Vancouver that convey sanitary sewage from the communities of Delta, Surrey, and Langley to the Annacis Island Wastewater Treatment Plant (AIWWTP). As Prime Contractor for this current and ongoing project, Tritech is responsible for the construction of two multi-stage …

Installation of Two South Surrey Odour Control Facilities Read More »

Scroll to Top