Application & Project
 Experience
 Water Supply & Distribution
 Water Treatment
 Wastewater Collection &
 Treatment
 Pump Stations
 Instrumentation, Controls &
 Automation
  Case Study 1

TRITECH GROUP LTD.
5413 – 271 Street
Langley, BC  V4W 3Y7

tel: (604) 607-8878
fax: (604) 607-8872
E-mail: info@tritechind.com

TRITECH GROUP LTD.
3949 – 54th Avenue NE, Calgary, AB, Canada
T3J 3W5

tel: (403) 203-4684
fax: (403) 203-4689
E-mail: info@tritechind.com

Home > Application & Project Experiene > Instrumentation, Controls & Automation > Case Study 1

Stride Avenue Landfill, Methane Gas Management System, and Building Electrical, Burnaby, BC

As sub-contractor to Stoelers Contracting Ltd., Tritech supplied and installed all mechanical and electrical equipment for this landfill gas- management system as well as the electrical works for the building. Included in the mechanical and electrical portion were landfill gas-extraction wells, wellheads, laterals, header piping, control valves, condensate traps, vacuum blowers, a skid-mounted utility flare, associated flare and blower controls. Additionally, Tritech provided the electrical power supply for the blower, landfill gas monitoring wells around the perimeter of the site and decommissioning of the existing vents associated with the existing landfill gas-interception trench.