Application & Project
 Experience
 Water Supply & Distribution
 Water Treatment
 Wastewater Collection &
 Treatment
  Case Study: 1
  Case Study: 2
  Case Study: 3
  Case Study: 4
 Pump Stations
 Instrumentation, Controls &
 Automation

TRITECH GROUP LTD.
5413 – 271 Street
Langley, BC  V4W 3Y7

tel: (604) 607-8878
fax: (604) 607-8872
E-mail: info@tritechind.com

TRITECH GROUP LTD.
3949 – 54th Avenue NE, Calgary, AB, Canada
T3J 3W5

tel: (403) 203-4684
fax: (403) 203-4689
E-mail: info@tritechind.com

Home > Application & Project Experience > Wastewater Collection & Treatment > Case Study 4

S. Delta/Ladner Sewage Forcemain, Delta, BC

General contractor this project that encompassed the supply and installation of 75 meters of 1,050-millimeter diameter steel sanitary sewer forcemain to connect to the GVS & DD interceptor in Delta. Additionally, this project included the supply and installation of the 900-millimeter diameter to 600-millimeter diameter steel spools for bypassing the Ladner Trunk Pump Station. Tie-ins to existing systems accomplished using line stops, meaning no down time for the existing pipelines.