Application & Project
 Experience
 Water Supply & Distribution
 Water Treatment
  Case Study: 1
  Case Study: 2
  Case Study: 3
  Case Study: 4
 Wastewater Collection &
 Treatment
 Pump Stations
 Instrumentation, Controls &
 Automation

TRITECH GROUP LTD.
5413 – 271 Street
Langley, BC  V4W 3Y7

tel: (604) 607-8878
fax: (604) 607-8872
E-mail: info@tritechind.com

TRITECH GROUP LTD.
3949 – 54th Avenue NE, Calgary, AB, Canada
T3J 3W5

tel: (403) 203-4684
fax: (403) 203-4689
E-mail: info@tritechind.com

Home > Application & Project Experiene > Water Treatment > Case Study 2

Stone Indian Band Water Treatment Plant, Hanceville, BC

General contractor for the construction of a 260 cubic meter per day enhanced slow sand filtration water treatment plant. Additionally, the general construction of this plant included all site works, structural, architectural, and mechanical systems, as well as electrical, installation of owner supplied items, finishes, testing and start-up. Site work including excavation, backfilling, buried pipelines and drains electrical services, sludge lagoon, site grading, and road works.