Project Description

This project involved the upgrade of a booster station in Abbotsford, BC.


2007

City of Abbotsford

Tritech’s scope of work for this project included:

  • 6m x 8m pump station building expansions
  • Two 200 HP VTP pumps and motors
  • Suction and discharge piping
  • Flow meter chamber
  • Hydro pad mount transformer
  • 750 KW standby generator
  • MCC cabinet and ASD Drives
  • SCADA

This project required Tritech to maintain the operations of the existing facility during the construction period. Tritech also worked around site access challenges.