Project Description
Tritech acted as design-builder for the design and construction of a new Booster Station (Booster Station #13-1) that was required to boost pressure and provide required fire flow from an existing reservoir to a new pressurized water service to four developments (a total of 173 lots) in the Eastern Hillsides of Chilliwack.
Completed
November 2019
Owner
5 Development Companies
Scope
Tritech’s scope of work for the Booster Station 13-1 included:
- Engineering Design, review, and IFC for: Civil, Structural, Process Mechanical, HVAC, Electrical and Controls
- Procurement of all associated equipment including:
– 2 x Jockey Pumps, 3 x Full Flow Pumps
– All Associated Piping and Valves
– All Associated Electrical and Controls Equipment
– 1 x Standby Diesel Generator
– HVAC and plumbing - Construction:
– Civil piping connection to 200mm existing water main stubs
– Building– concrete foundation, masonry block walls with wood truss roof
– Process mechanical installations – pumps, piping & valves
– Electrical installations – including standby generator
– HVAC installation
– Fencing & gates and site restoration
– Commissioning including SCADA integration